APU de Tomacorriente 110 V
En :
| 1. MATERIALES | |||||
| Descripción | Unidad | Cantidad | Precio productivo | Costo total | |
| 16101 | Alambre galvanizado No.18 | Kg | 0.13 | 2.54 | 0.33 |
| 16936 | Alambre sólido THHN 12 AWG | m | 14.00 | 0.58 | 8.06 |
| 16956 | Caja PVC rectangular | u | 1.00 | 0.79 | 0.79 |
| 16964 | Conectores EMT 1/2" | u | 2.00 | 0.32 | 0.65 |
| 17033 | Tubo conduit EMT 1/2" x 3m | u | 2.00 | 3.62 | 7.24 |
| 17036 | Unión conduit 1/2" | u | 2.00 | 0.30 | 0.60 |
| 18417 | Tomacorriente industrial polarizado con tapa 21-220w | u | 1.00 | 5.00 | 5.00 |
| 19163 | Cinta aislante 19mm x 9m x 0.13 mm | u | 1.00 | 0.59 | 0.59 |
| Total materiales | 23.26 | ||||
| 2. MANO DE OBRA | |||||
| Descripción | Unidad | Cantidad | Precio productivo | Costo total | |
| 15837 | Peón | Hora | 4.00 | 4.05 | 16.20 |
| 15848 | Electricista | Hora | 2.00 | 4.10 | 8.20 |
| 15867 | Maestro Electrico | Hora | 0.40 | 4.55 | 1.82 |
| Total mano de obra | 26.22 | ||||
| 3. EQUIPO, MAQUINARIA Y HERRAMIENTAS | |||||
| Descripción | Unidad | Cantidad | Precio productivo | Costo total | |
| Herramientas menores % | 5.00% | 1.31 | |||
| Total equipo, maquinaria y herramientas | 1.31 | ||||
| 4. GASTOS GENERALES Y ADMINISTRATIVOS |
| 5. UTILIDAD |
| 6. IMPUESTOS | ||
| Total Precio Unitario de Tomacorriente 110 V | 50.79 | |
Especificaciones técnicas:
RENDIMIENTO: 2.00 Horas/pto