APU de Colector H.A. S=0.80x1.00 M
En :
| 1. MATERIALES | |||||
| Descripción | Unidad | Cantidad | Precio productivo | Costo total | |
| 15914 | Cemento Fuerte Tipo GU Saco 50 Kg - Holcim DISENSA | saco | 6.20 | 7.68 | 47.62 |
| 16008 | Tablero TRIPLEX CORRIENTE 1.22X2.44X12C | u | 0.22 | 26.05 | 5.73 |
| 18054 | Arena | m3 | 0.56 | 13.50 | 7.56 |
| 18055 | Ripio | m3 | 0.82 | 18.00 | 14.76 |
| 18056 | Agua | m3 | 0.19 | 0.85 | 0.16 |
| 18083 | Acero de refuerzo fc=4200kg/cm2 | kg | 35.00 | 0.81 | 28.35 |
| 18974 | Clavos 2", 2 1/2", 3", 3 1/2" | kg | 1.70 | 2.13 | 3.62 |
| 18975 | Alfajia 6x6x250 cm | u | 1.40 | 2.50 | 3.50 |
| 19623 | Plastiment BV-40 10 Kg - Sika DISENSA | u | 0.07 | 22.60 | 1.58 |
| 22034 | Puntal de madera de eucalipto | m | 2.80 | 1.12 | 3.14 |
| Total materiales | 116.01 | ||||
| 2. MANO DE OBRA | |||||
| Descripción | Unidad | Cantidad | Precio productivo | Costo total | |
| 15837 | Peón | Hora | 8.00 | 4.05 | 32.40 |
| 15838 | Albañil | Hora | 2.00 | ||
| 15839 | Operador de equipo | Hora | 4.00 | 4.10 | 16.40 |
| 15868 | Maestro de Obra | Hora | 2.00 | 4.33 | 8.66 |
| Total mano de obra | 57.46 | ||||
| 3. EQUIPO, MAQUINARIA Y HERRAMIENTAS | |||||
| Descripción | Unidad | Cantidad | Precio productivo | Costo total | |
| 18057 | Concretera 1 saco | Hora | 2.00 | 4.48 | 8.96 |
| 18058 | Vibrador de manguera | Hora | 2.00 | 4.06 | 8.12 |
| Herramientas menores % | 5.00% | 2.87 | |||
| Total equipo, maquinaria y herramientas | 19.95 | ||||
| 4. GASTOS GENERALES Y ADMINISTRATIVOS |
| 5. UTILIDAD |
| 6. IMPUESTOS | ||
| Total Precio Unitario de Colector H.A. S=0.80x1.00 M | 193.43 | |
Especificaciones técnicas:
RENDIMIENTO: 2.00 Horas/m